🚀 Engineering Procedures¶
Engineering Excellence
Standardized procedures and best practices for BidScript development
🔀 Pull Request Process¶
graph TD
A[Create Feature Branch] --> B[Develop Changes]
B --> C[Run Local Tests]
C --> D{Tests Pass?}
D -->|No| E[Fix Issues]
E --> C
D -->|Yes| F[Open Pull Request]
F --> G[Automated Checks]
G --> H{CI/CD Pass?}
H -->|No| I[Fix CI Issues]
I --> G
H -->|Yes| J[Peer Review]
J --> K{Review Approved?}
K -->|Changes Requested| L[Address Feedback]
L --> J
K -->|Approved| M[Merge to Main]
M --> N[Auto-Deploy to Staging]
N --> O[Production Release]
style A fill:#e3f2fd
style M fill:#42a5f5
style O fill:#1976d2
Pull Request Workflow
🌱 Create Branches
Use clear naming conventions: feature/, bugfix/, hotfix/
git checkout -b feature/user-authentication
📝 Open Pull Request
Clearly associate with related tasks or issues using GitHub linking
🤖 Automated Checks
Ensure code passes automated testing, linting, and security scans
👥 Peer Review
Conduct thorough code reviews focusing on quality, security, and maintainability
🔀 Merge & Rebase
Merge approved PRs using rebase or squash to maintain history clarity
🛠️ Infrastructure Configuration¶
graph TB
subgraph "Development Environment"
DevDocker[Docker Containers]
DevHot[Hot Reloading]
DevDebug[Debug Config]
DevMock[Mock Services]
end
subgraph "Staging Environment"
StageProd[Production-like]
StageAuto[Auto Deploy]
StageTest[Integration Tests]
StageMonitor[Monitoring]
end
subgraph "Production Environment"
ProdHA[High Availability]
ProdScale[Auto-scaling]
ProdMonitor[Full Monitoring]
ProdDR[Disaster Recovery]
end
subgraph "Azure Infrastructure"
AzureApp[Container Apps]
AzureDB[PostgreSQL]
AzureRedis[Redis Cache]
AzureStorage[Blob Storage]
AzureMonitor[Application Insights]
end
DevDocker -.-> StageProd
StageProd -.-> ProdHA
StageAuto --> AzureApp
ProdHA --> AzureApp
AzureApp --> AzureDB
AzureApp --> AzureRedis
AzureApp --> AzureStorage
AzureApp --> AzureMonitor
style DevDocker fill:#e3f2fd
style StageProd fill:#90caf9
style ProdHA fill:#1976d2
Infrastructure as Code
Use Terraform and Azure Resource Manager templates for all infrastructure provisioning. Store configurations in version control alongside application code.
📊 Reliability & Performance Monitoring¶
graph TB
subgraph "Monitoring Stack"
AppInsights[Application Insights]
Grafana[Grafana Dashboards]
Alerts[Alert Manager]
Logs[Log Analytics]
end
subgraph "Performance Metrics"
ResponseTime[Response Time<br/>< 200ms]
Uptime[Uptime<br/>99.9%]
ErrorRate[Error Rate<br/>< 0.1%]
Throughput[Throughput<br/>1000+ req/s]
end
subgraph "Alert Levels"
Critical[Critical<br/>Response > 5s]
Warning[Warning<br/>CPU > 80%]
Info[Info<br/>Memory > 70%]
end
AppInsights --> ResponseTime
AppInsights --> Uptime
AppInsights --> ErrorRate
AppInsights --> Throughput
Alerts --> Critical
Alerts --> Warning
Alerts --> Info
style Critical fill:#bbdefb
style Warning fill:#90caf9
style Info fill:#e3f2fd
📈 Performance Metrics
🚨 Alerting Thresholds
- Critical Response time > 5s
- Warning CPU usage > 80%
- Info Memory usage > 70%
- Critical Error rate > 1%
📌 Data Operations¶
🔍 Pre-Change Validation
💾 Backup & Recovery
🚢 Production Deployment¶
graph LR
subgraph "Pre-Deployment"
A[Code Review Approval]
B[Automated Tests Pass]
C[Security Scan Clean]
D[Performance Benchmarks]
end
subgraph "Deployment Process"
E[Blue-Green Deployment]
F[Health Checks]
G[Gradual Traffic Shift]
H[Real-time Monitoring]
end
subgraph "Post-Deployment"
I[Smoke Testing]
J[Performance Validation]
K[Error Rate Monitoring]
L[User Acceptance]
end
A --> E
B --> E
C --> E
D --> E
E --> F
F --> G
G --> H
H --> I
I --> J
J --> K
K --> L
L --> M[Deployment Complete]
style A fill:#e3f2fd
style E fill:#90caf9
style I fill:#64b5f6
style M fill:#1976d2
Rollback Strategy
Always maintain a tested rollback strategy. Database migrations should be backward compatible, and application deployments should support instant rollback.
✅ Testing Strategy¶
graph TB
subgraph "Unit Tests"
UT1[Component Logic]
UT2[Pure Functions]
UT3[Utility Methods]
UT4[API Endpoints]
UTCov[Coverage: 80%+]
end
subgraph "Integration Tests"
IT1[API Contracts]
IT2[Database Operations]
IT3[External Services]
IT4[Component Interactions]
ITCov[Coverage: 60%+]
end
subgraph "E2E Tests"
E2E1[User Journeys]
E2E2[Business Workflows]
E2E3[Critical Paths]
E2E4[Cross-browser Testing]
E2ECov[Coverage: Key Flows]
end
UT1 --> IT1
UT2 --> IT2
UT3 --> IT3
UT4 --> IT4
IT1 --> E2E1
IT2 --> E2E2
IT3 --> E2E3
IT4 --> E2E4
style UT1 fill:#e3f2fd
style IT1 fill:#90caf9
style E2E1 fill:#1976d2
🕵️♂️ Code Review Standards¶
🎯 Quality Criteria
- Code follows established patterns
- Functions are small and focused
- Variables have descriptive names
- Complex logic is documented
- Error handling is comprehensive
🔒 Security Checklist
- Input validation implemented
- Authentication/authorization checked
- Sensitive data properly handled
- SQL injection prevention
- XSS protection in place
⚡ Performance Review
- Database queries optimised
- Caching strategy considered
- Large datasets handled efficiently
- Resource cleanup implemented
- Memory leaks prevented
📑 Incident Response¶
graph TD
A[Alert Triggered] --> B{Severity Level?}
B -->|Critical| C[Immediate Response<br/>5 minutes]
B -->|High| D[Quick Response<br/>15 minutes]
B -->|Medium| E[Standard Response<br/>1 hour]
B -->|Low| F[Next Business Day]
C --> G[Initial Investigation]
D --> G
E --> G
F --> G
G --> H[Form Response Team]
H --> I[Implement Fix]
I --> J{Fix Successful?}
J -->|No| K[Escalate & Retry]
K --> I
J -->|Yes| L[Monitor Stability]
L --> M[Document Actions]
M --> N[Post-Mortem Analysis]
N --> O[Incident Closed]
style C fill:#bbdefb
style D fill:#90caf9
style E fill:#64b5f6
style F fill:#e8eaf6
style O fill:#1976d2
Detection
- Automated monitoring alerts
- User-reported issues
- Health check failures
- Performance degradation
Investigation
- Gather relevant logs
- Identify affected systems
- Determine impact scope
- Form incident response team
Resolution
- Implement immediate fix
- Monitor for stability
- Communicate status updates
- Document actions taken
Post-Mortem
- Root cause analysis
- Timeline reconstruction
- Lessons learned
- Process improvements
📞 On-Call Excellence¶
📋 Responsibilities
- Monitor system health 24/7
- Respond to critical alerts within 15 minutes
- Escalate complex issues appropriately
- Document all incidents thoroughly
- Maintain communication with stakeholders
🚨 Response Times
🔄 Branch Management¶
gitgraph:
options:
showBranches: true
showCommitLabel: true
commit id: "Initial"
branch staging
branch feature/user-auth
checkout feature/user-auth
commit id: "Add login"
commit id: "Add validation"
checkout staging
merge feature/user-auth
commit id: "Integration test"
checkout main
merge staging
commit id: "Release v1.2.0"
branch hotfix/security-fix
checkout hotfix/security-fix
commit id: "Security patch"
checkout main
merge hotfix/security-fix
commit id: "Hotfix v1.2.1"
graph TB
subgraph "Branch Strategy"
Main[main<br/>Production-ready code]
Staging[staging<br/>Integration testing]
Feature[feature/*<br/>Active development]
Hotfix[hotfix/*<br/>Emergency fixes]
Release[release/*<br/>Release preparation]
end
subgraph "Workflow Rules"
Rule1[All PRs require review]
Rule2[Tests must pass]
Rule3[No direct commits to main]
Rule4[Clear commit messages]
Rule5[Semantic versioning]
end
Feature --> Staging
Staging --> Main
Hotfix --> Main
Release --> Main
Main --> Rule1
Main --> Rule2
Main --> Rule3
Main --> Rule4
Main --> Rule5
style Main fill:#d4edda
style Staging fill:#fff3cd
style Feature fill:#e3f2fd
style Hotfix fill:#f8d7da